town votes yes

by josh bourassa

What’s proposed the main idea of the easement is to make the river front property of bohanan farm more accessible to public use. Which includes a small boat launch for people to use the river. The boat launch on the other side of the road is not available anymore because the owner of the land doesn’t want people to have access to the land. The easement is a 900,000-dollar project joined together with the town and the us government in bonds as well as private donations.

At the town meeting on December 5th they voted on the easement and the vote was passed 662 to 228. There was about 950 voters that listened to the whole thing some in the gym and they had to over flow into auditorium.
By Josh Bourassa